Renewable energy · Limited company
Grupo Render Industrial
Grupo Render Industrial Ingeniería y Montajes S.L. · Navalmoral de la Mata, Cáceres, Spain
- Solar
- Wind
- Other
- Founded
- 2003
- Projects
- 14
- Certifications
- 3
About
Founded in 2003, Grupo Render Industrial is a limited company headquartered in Navalmoral de la Mata, Spain specializing in Solar, Wind, Other.
Grupo Render Industrial is a Spanish engineering and construction group founded in 2003 from the merger of three companies specialised in the integrated management and promotion of industrial projects and facilities. Its activities include the design, construction and maintenance of energy infrastructure such as high-voltage lines, electrical substations and distribution systems, as well as the installation of solar PV plants and wind park infrastructure. The company also carries out civil works, industrial building projects and electrical installations for public and private clients, including Adif, and holds ISO 9001:2015 and ISO 14001 standards. Its stated mission includes contributing to the energy transition through renewable energy solutions. It operates across mainland Spain, the Canary and Balearic Islands, and has stated an interest in expanding internationally, particularly in South America.
Focus areas
- engineering
- construction
- solar PV
- wind
- substations
- high-voltage lines
- energy infrastructure
- EPC
- maintenance
- Adif
- renewable energy
Products & services
Business models
- B2B
- EPC
Value chain
- Development
- Engineering
- Construction
- O&M
Service areas (1)
Energy infrastructure engineering and construction
Engineering, assembly, construction and commissioning of high-voltage lines, substations, solar PV plants, wind park infrastructure and distribution systems.
Locations
Headquarters
Polígono Industrial Campo Arañuelo S/N, 10300, Navalmoral de la Mata, Cáceres, Spain
Service regions
- Spain
Projects
14Instalaciones fotovoltaicas en cubiertas y marquesinas de estaciones de Adif
21 of 45 planned rooftop and canopy PV installations at Adif stations, including Málaga, Alicante, Sevilla, Burgos, Zaragoza and Adif's Madrid headquarters. Self-consumption without surplus. Includes two years of maintenance.
25 instalaciones fotovoltaicas en estaciones de tren para autoconsumo con excedentes
Photovoltaic installations at railway stations for self-consumption with surplus energy.
Subestación para parque solar fotovoltaico de 50 MW en Villanueva del Rey
Substation for a 50 MW solar PV park.
Planta solar fotovoltaica en la Base Aérea de Torrejón de Ardoz
Solar PV plant at the Torrejón de Ardoz air base.
Planta solar fotovoltaica en la Base Aérea de Morón de la Frontera
Solar PV plant at the Morón de la Frontera air base.
Ejecución de los parques solares fotovoltaicos Fuentita I y II
Construction of the Fuentita I and Fuentita II solar PV parks.
Instalación de dos plantas fotovoltaicas en Páramo Medio
Installation of two solar PV plants in Páramo Medio.
Línea eléctrica de 220 kV de interconexión entre las subestaciones Rey Solar I&II y Carmona
Single-circuit 220 kV power line interconnecting the Rey Solar I and II substations with Carmona.
Subestación eléctrica 66/20 kV de 50 MVA para evacuación de plantas fotovoltaicas de 7 MW y 4 MW en el ITER
66/20 kV, 50 MVA substation evacuating energy from 7 MW and 4 MW solar PV plants.
Ejecución de los parques eólicos Camino de la Madera y Agüimes
Construction of the Camino de la Madera and Agüimes wind parks.
Ejecución de los parques eólicos Magua I y Hoya de Lucas
Construction of the Magua I and Hoya de Lucas wind parks.
Subestación parque eólico Padornelo 3
Substation for the Padornelo 3 wind park.
Subestación parque eólico Acíberos
Substation for the Acíberos wind park.
Subestación eléctrica Diamond
Electrical substation in Trujillo.
Credentials & affiliations
Certifications
ISO 9001:2015
ISO 14001:2015
Empresa Instaladora Certificada
Partnerships
FENIE Energía