About
NHOA Energy is a subsidiary headquartered in Milan, Italy specializing in Energy Storage.
NHOA Energy designs, delivers and services utility-scale and industrial battery energy storage systems (BESS) based on proprietary technology. Its offering includes the NHEXUS all-in-one power conversion station, the C-BESS power conversion system and the PROPHET plant control platform. The company acts as technology supplier and turnkey contractor, covering engineering, supply, installation, commissioning and service. Its R&D and production are based in Italy. Since 2021 it has been part of TCC Group Holdings. Headquartered in Milan with regional hubs in Houston, Perth, Taipei and Milan for EMEA.
Headquarters
Company type
Focus areas
Products & services
Business models
Value chain
Service areas (4)
EMEA
Regional hub based in Milan for Europe, Middle East and Africa, covering utility-scale BESS delivery and service.
Americas
Regional hub based in Houston for BESS delivery and service.
Australia Pacific
Regional hub based in Perth for BESS delivery and service.
Asia
Regional hub based in Taipei for BESS delivery and service.
Locations
Headquarters
Piazzale Lodi 3, 20137, Milan, Italy
Operating locations (13)
- Corso Mortara 22, Turin, Italy
- Via dei Boschi Vecchi, Cosio Valtellino, Italy
- Calle Príncipe de Vergara 112, Madrid, Spain
- Tower 5, Collins Square, 727 Collins Street Level 23, Melbourne, Victoria, Australia
- Allendale Square, 77 St Georges Terrace Level 29, Perth, Western Australia, Australia
- Zhongshan N. Rd., Sec. 2 11F., No. 113, Taipei, Taiwan
- Alexandra Road, Connect House, 133-137, Wimbledon, London, United Kingdom
- Eccleston Square, Thomas House, 84, London, United Kingdom
- Little Falls Drive 251, Wilmington, Delaware, United States
- West Loop South, Suite 1310 2000, Houston, Texas, United States
- Boulevard Saint Michel, boîte 6 65, Etterbeek, Belgium
- Toranomon 23F, 4 Chome-1-1, Minato City, Tokyo, Japan
- Av. de la Floresta 497, San Borja, Lima, Peru
Service regions
Projects
2MACSE battery project in Campania
Utility-scale BESS awarded under Italy's MACSE long-duration storage mechanism, part of a combined 600 MWh and 90 MW contracted capacity across two projects. Site installation expected to start by September 2026, with start-up targeted for January 2028.
MACSE battery project in Sardinia
Utility-scale BESS awarded under Italy's MACSE long-duration storage mechanism, part of a combined 600 MWh and 90 MW contracted capacity across two projects. Site installation expected to start by September 2026, with start-up targeted for January 2028.